Live travel news
Traffic news in London
Details of coach parking facilities and other useful information for coach drivers in London is available below. Click the icons on the map for specific information and use the map controls or drag the map to find an area of interest.
A12 (Leytonstone)
On A12 between East Cross Route / A12 and Cathall Road / B161
20 Nov 09 to 23 Nov 09
Eastbound and westbound direction. Lane 3 will be closed in both directions.
21 Nov 09 : Lane restriction in place eastbound on the A12 - Traffic is light and flowing well
A13 (Victoria Docks)
On A13 between Ferry Lane and Prince Regent Lane / A112
17 Nov 09 to 22 Nov 09
Eastbound direction. A13 will be reduced to one lane in different phases for road marking works. Weekdays 2100hrs - 0500hrs and on weekends the restrictions will be 2100hrsl 0600hrs Sat and 2100hrs - 0700hrs Sun. Daily activity between 21:00 and 05:00.
A409 (Wealdstone)
On A409 between College Road and The Bridge / A409
23 Apr 09 to 14 Dec 09
Northbound and southbound direction. Temporary signals in operation at various locations to facilitate gas mains replacement works.
Barnet Way (Barnet By-Pass) / A1 (Mill Hill)
On Barnet Way (Barnet By-Pass) / A1 between Northway Circus (Apex Corner) and Stirling Corner
20 Nov 09 to 21 Nov 09
Northbound direction. Lane three closed for resurfacing.
20 Nov 09 : No reported delays in the area
Battersea Bridge Road / A3220 (Battersea)
On Battersea Bridge Road / A3220 between Battersea Bridge and Battersea Park Road / A3205
11 Nov 09 to 02 Oct 10
Northbound and southbound direction. There will be lane restrictions to facilitate footway resurfacing.
Bishopsgate / A10 (City, North West)
On Bishopsgate / A10 between Threadneedle Street and Camomile Street / A1211
29 Sep 09 to 31 Jan 10
Northbound and southbound direction. Crane operation with road closure in both directions..Local diversions in effect Daily activity between 20:00 and 00:00.
Bishopsgate / A10 (City, North West)
On Bishopsgate / A10 between Houndsditch / A1211 and Camomile Street / A1211
14 May 07 to 01 Apr 11
Southbound direction. Restrictions expected on Bishopsgate and Camomile Street during deliveries to construction site at Heron Tower.
Bishopsgate / A10 (Stepney)
At the junction of Norton Folgate
21 Nov 09
Northbound and southbound direction. Lane 2 closed in both directions.
Blackwall Tunnel (Both Bores) (Poplar)
At the junction of Blackwall Tunnel Northern Approach / A102 and Blackwall Tunnel Southern Approach / A102 and Blackwall Tunnel Approach / A102
From 25 Sep 09
Northbound and southbound direction. Ongoing maintenance work on Sundays. The southbound tunnel is normally closed on Sunday mornings from 0100hrs until 0800hrs; on alternate weekends the Northbound Tunnel is closed during the same times. For the duration of the Northbound closure the Northbound traffic flow will be maintained by the use of the Southbound Tunnel. Southbound traffic will be diverted via the Rotherhithe Tunnel, Dartford River Crossing or Central London Bridges. The Southbound Bus Route 108 is maintained during the closure and is escorted through the works area.
Borough High Street / A3 (Bermondsey)
On Borough High Street / A3 between Great Dover Street / A2 and Marshalsea Road / A300
From 28 Sep 09
Northbound and southbound direction. As part of the ongoing Victorian water and gas main replacement programme, Morrison Utilities working on behalf of Thames Water and Southern Gas Network will be working jointly on Borough High Street. To facilitate the works, lane restrictions will be implemented on Borough High Street and Great Dover Street to control all traffic.
21 Nov 09 : A new road layout is in place as of today, Saturday 21st November. There is now no access into Great Dover Street and Long Lane from Borough High Street and Marshalsea Road, however traffic travelling in the opposite direction on Great Dover Street and Long Lane can enter Borough High Street. Temporary traffic signals remain in operation at the junction with Borough High Street reduced to one lane southbound and two lanes northbound. Traffic is light and flowing well.
Borough High Street / A3 (Bermondsey)
On Borough High Street / A3 between Bedale Street and London Bridge Street
From 05 Nov 09
Northbound direction. Road reduced to 1 lane due to construction works.
Bowes Road (North Circular Road) / A406 (New Southgate)
At the junction of Telford Road
From 18 Nov 09
Westbound direction. Due to a lane restriction at this junction traffic is slow moving in the area.
21 Nov 09 : Lane restrictions remains in place. Traffic is flowing well past the restrictions.
Bowes Road (North Circular Road) / A406 (Wood Green)
At the junction of Green Lanes / A105
01 Jan 09 to 01 Jan 10
Eastbound and westbound direction. Various road closure to facilitate works.
Brixton Hill / A23 (Brixton)
At the junction of Effra Road / A23
10 Aug 09 to 31 Dec 09
Northbound and southbound direction. Various lane restrictions to facilitate works.
Brompton Road / A4 (Chelsea)
At the junction of Thurloe Place / A4
From 07 Oct 09
Westbound direction. Lane three is currently closed westbound at the junction with Fulham Road and Thurloe Place.
Brownhill Road / A205 (Catford)
At the junction of Plassy Road / A205
From 20 Nov 09
Eastbound direction. Emergency gas works. Temporary traffic lights in place.
21 Nov 09 : Traffic is currently flowing well in the area.
Buckingham Palace Road / A3214 (Westminster)
At the junction of Victoria Street / A302
20 Nov 09 to 22 Nov 09
Eastbound and westbound direction. Contractors on behalf of the Victoria Station Upgrade works will require access to the carriageway of Buckingham Palace Road. There will be nearside lane restrictions on Buckingham Palace Road southbound between Allington Street and Terminus Place.
21 Nov 09 : The bus lane and lane one (of 2) are currently closed southbound. Traffic is flowing well in the area.
Camden Road / A503 (Holloway)
At the junction of Parkhurst Road / A503
11 Nov 09 to 14 Dec 09
Southbound direction. Bus lane is closed.
Cannon Street (City, South West)
At the junction of Walbrook
17 Nov 09 to 21 Nov 09
Eastbound and westbound direction. Single alternate lane traffic with temporary traffic signals in operation.
21 Nov 09 : Cannon Street remains closed at the junction with King William Street - Traffic light and flowing well on diversion
Chalk Farm Road / A502 (Regent's Park)
At the junction of Castlehaven Road / A502
21 Nov 09
Southbound direction. Chalk Farm Road is blocked southbound at the junction with Castlehaven Road due to an accident. Expect delays- please use alternative routes
21 Nov 09 : Chalk farm Road has reopened - Traffic flows have returned to normal for the time of day
Chelsea Fc, Stamford Bridge (Fulham)
At the junction of Fulham Road / A304
21 Nov 09
Chelsea v Wolverhampton Match kicks off at 1500hrs
Cherry Lane (West Drayton)
At the junction of A408
26 Oct 09 to 02 Mar 10
All approaches Roundabout improvement works, expect delays.
Chigwell Road / A113 (Woodford)
At the junction of Albert Road
21 Oct 09 to 21 Apr 10
Northbound and southbound direction. Temporary signals in operation.
Chingford Road / A112 (Walthamstow)
On Chingford Road / A112 between Cazenove Road and Knebworth Avenue
19 Oct 09 to 17 Jan 10
Northbound and southbound direction. Various lane restrictions are in place with temporary traffic lights in operation for gas main renewal
Clapham High Street / A3 (Clapham)
On Clapham High Street / A3 between Venn Street and Stonhouse Street
19 Oct 09 to 29 Nov 09
Northbound direction. Thames Water will be carrying out Victorian Mains Replacement (VMR) works at the above location. Works will be on the northbound carriageway and will require lane restrictions.
Clapham High Street / A3 (Clapham)
On Clapham High Street / A3 between Clapham Road / A3 and Clapham Common South Side / A3
From 06 Jan 09
Northbound direction. Carriageway restrictions, Monday to Saturday only, at various locations along Clapham High Street, The Pavement and Clapham Common South Side between the junctions of Long Road and Clapham Road to facilitate works by Southern Gas Networks. Side road may also be affected, including Stonhouse Street, Venn Street, Prescott Place, Clapham Manor Street, Edgeley Road, Voltaire Road and Gauden Road.
Cray Avenue / A224 (St Mary Cray)
On Cray Avenue / A224 between Court Road (Orpington By-Pass) / A224 and Sevenoaks Way / A224
13 Oct 09 to 19 Feb 10
Northbound and southbound direction. Lanes restrictions in place to facilitate waterworks.
Dean Farrar Street (Westminster)
On Dean Farrar Street between Dacre Street and Tothill Street
03 Aug 09 to 14 Dec 09
Northbound and southbound direction. Road is closed to facilitate demolition works.
Denmark Hill / A215 (Camberwell)
At the junction of Champion Park / A2216
22 Sep 09 to 15 Jan 10
Northbound and southbound direction. To enable contractors working on behalf of Thames Water to carry out essential work to repair a water leak feeding Kings College Hospital it will be necessary to close a small section at the start of the bus lane just past the junction of Champion Park to enable an excavation to take place. Operation of the remaining section of bus lane will continue to be maintained.
Deptford Bridge (Greenwich)
At the junction of Greenwich High Road / A206 and Deptford Broadway / A2 and Blackheath Road / A2
From 17 Oct 09
Eastbound and westbound direction. A2 reduced to 1 lane both directions and traffic lights in barrels.
Dulwich Road / A2214 (Herne Hill)
At the junction of Railton Road / B223
17 Nov 09 to 21 Nov 09
Northbound and southbound direction. F.M. Conway working on behalf of London Borough of Lambeth will be carrying out footway works as part of the Herne Hill junction improvement programme.
Earls Court Road / A3220 (West Brompton)
On Earls Court Road / A3220 between Bramham Gardens and Bolton Gardens / A3218
21 Nov 09 to 22 Nov 09
Southbound direction. Lane 1 (of 3) restrictions in place at location to facilitate the works.
21 Nov 09 : Restrictions are now in place in lane two. Traffic is currently flowing well on approach. Expect delays.
East London
EAST LONDON AREA
02 Jul 07 to 31 Jul 12
Olympic Park Construction Various Roads and Lanes closures in the Stratford and New Town areas (Newham) to enable the construction of the Olympic Park. Closures includes the following: Carpenters Rd (part), Bridgewater Rd, Clays Lane, Trafford Close, Clays lane Close, Tweedale Ct, Smithies Ct, Marshgate Lane, Pudding Mill Lane, Quarter Mile Lane (part) and various footpaths and towpaths within Olympic Park area. Marshgate Lane (south of railway), Pudding Mill Lane (south of railway).
Euston Road / A501 (Marylebone, East)
At the junction of Fitzroy Street
16 Nov 09 to 12 Feb 10
Eastbound and westbound direction. Various lane restrictions in place on Euston Road junction with Fitzroy Street. Daily activity between 10:00 and 15:30.
21 Nov 09 : Lane 3 (of 3) eastbound remains closed, westbound lane restrictions have been removed. Traffic is currently flowing well in both directions on Euston Road.
Ferry Lane Roundabout (Rainham)
At the junction of Ferry Lane
09 Nov 09 to 23 Nov 09
Eastbound and westbound direction. Westbound A13 off slip and eastbound on slip from Ferry Lane Roundabout, lane one restrictions in place.
Finborough Road / A3220 (Fulham)
At the junction of Old Brompton Road / A3218
16 Nov 09 to 23 Nov 09
Northbound direction. 3-way temporary traffic lights in operation for electricity works.
21 Nov 09 : The northbound lane from Old Brompton Road eastbound is blocked for works - Traffic light and flowing well in the area
Finchley Road / A41 (Kilburn)
On Finchley Road / A41 between Rosemont Road and Lithos Road
06 Nov 09 to 25 Jan 10
Northbound direction. Lane one restriction in place for gas main replacement works. On the weekend of the 14th and 15th November lane 2 will be closed northbound from Frognal Court to Rosemont Road.
Gants Hill Roundabout (Newbury Park)
At the junction of Woodford Avenue / A1400 and Cranbrook Road / A123 and Eastern Avenue / A12
24 Jul 09 to 30 Apr 10
Eastbound and westbound direction. Major reconstruction scheme. The roundabout and all approaches have lane restrictions in place.
Goldhawk Road / A402 (Shepherd's Bush)
At the junction of Hammersmith Grove
From 02 Nov 09
Westbound direction. Lane one restriction westbound. Hammersmith Grove is closed northbound with no right hand turn from Goldhawk Road.
21 Nov 09 : One (of two) lanes is closed eastbound on approach to Hammersmith Grove to facilitate the works. Traffic is currently flowing well past the restrictions.
Goswell Road / A1 (City, North East)
At the junction of Owen Street
24 Aug 09 to 23 Nov 09
Westbound direction. Lane restrictions for junction improvement works, expect delays.
Gracechurch Street / A10 (City, South East)
At the junction of Cornhill
From 05 Oct 09
Northbound direction. Lane restrictions in place on Gracechurch Street.
Gracechurch Street / A10 (City, South East)
On Gracechurch Street / A10 between Lombard Street and Cornhill
From 19 Nov 09
Northbound direction. Lane one is closed to facilitate repairs to a cable.
21 Nov 09 : One lane (of two) is closed northbound on Gracechurch Street for electricity works. Traffic flowing well through the restrictions at present.
Grays Inn Road / A5200 (Bloomsbury)
At the junction of Acton Street / A201
From 18 Nov 09
Southbound direction. Restrictions in place to facilitate emergency works to a gas leak.
Great Cambridge Road / A10 (Palmers Green)
At the junction of North Circular Road / A406
19 Oct 09 to 18 Dec 09
Northbound lane restrictions in place on Great Cambridge Road between Hedge Lane and Church Street
Great Dover Street / A2 (Bermondsey)
On Great Dover Street / A2 between Black Horse Court and Globe Street
21 Nov 09
Northbound and southbound direction. Stop and Go boards will be in place to regulate traffic.
Green Lanes / A105 (Palmers Green)
At the junction of North Circular Road / A406
21 Nov 09
Northbound Accident on Green Lanes at the junction with the North Circular Road - Road blocked northbound - No access to Green Lanes northbound from Green Lanes or the North Circular Road Westbound
21 Nov 09 : The remaining vehicle has been recovered and all lanes are open. Traffic is flowing well.
Green Lanes / A105 (Palmers Green)
At the junction of North Circular Road / A406
20 Nov 09 to 23 Nov 09
Southbound direction. No left hand turn from the A406 onto A105 Green Lanes. Diversions in place.
Greenwich One-Way System (Greenwich)
At the junction of King William Walk / A200 and College Approach / A200 and Nelson Road / A206
01 Jul 09 to 01 Dec 09
Eastbound and westbound direction. A new gas main is being installed over a period of five months. The work will extend from Greenwich Church Street along Nelson Road, Romney Road and into Trafalgar Road. Works will include banned turns and temporary traffic signals.
Grosvenor Place / A302 (Belgravia)
On Grosvenor Place / A302 between Duke Of Wellington Place / A4 and Hobart Place / A3217
18 Nov 09 to 30 Mar 10
Northbound and southbound direction. Various lane restrictions will be in place to facilitate works.
Hanger Lane (North Circular Road) / A406 (Acton)
At the junction of Uxbridge Road / A4020
From 04 May 09
Southbound direction. Restrictions in place on the slip road to eastbound Uxbridge Road.
Hanger Lane (North Circular Road) / A406 (Ealing)
On Hanger Lane (North Circular Road) / A406 between Ealing Village and Hamilton Road
06 Feb 09 to 01 Jun 10
Northbound and southbound direction. 24 hour bridge works with road reduced to 1 lane each direction.
Harrow Road Underpass (Paddington) (Paddington)
At the junction of Harrow Road / A404
21 Nov 09
Eastbound and westbound direction. The underpass is closed to facilitate maintenance works.
21 Nov 09 : The underpass is currently open and flowing well.
Hartfield Road / A219 (Wimbledon)
At the junction of Hartfield Crescent
21 Nov 09 to 24 Nov 09
Northbound and southbound direction. Walker Construction Ltd working on behalf of Tramlink will be working at the Dundonald Road Tram Stop. Traffic will be managed using priority boards. Daily activity between 01:00 and 04:30.
21 Nov 09 : At present there are no reports of traffic congestion.
Haymarket / A4 (St James's)
At the junction of Jermyn Street
From 21 Nov 09
All directions. The traffic signals are not under computer control.
21 Nov 09 : Traffic is currently flowing well on Haymarket.
High Road / A10(T) (South Tottenham)
At the junction of Broad Lane / A504 and Broad Lane / A503
From 21 Nov 09
J 31/31 Traffic lights are all out - Approach junction with care
21 Nov 09 : Traffic signals are all out. Approach junction with care. Traffic is flowing well in the area.
High Street / A118 (Stratford)
At the junction of Warton Road
27 Oct 09 to 01 May 10
Eastbound and westbound direction. Off peak restrictions.
High Street South / A117 (Victoria Docks)
At the junction of Newham Way / A13
From 18 Nov 09
Traffic lights are all out, approach with care.
21 Nov 09 : Traffic lights remain out of order. Approach with care. Traffic is flowing well in the area.
Homerton High Street / A102 (Homerton)
On Homerton High Street / A102 between Crozier Terrace and Kenworthy Road / A102
21 Nov 09 to 22 Nov 09
Eastbound direction. On 21/11/09 (08:00 till 18:00) Lane 1 closure with the use of two way temporary traffic lights. Temp lights will be removed on the Saturday and the excavation will be temporarily reinstated. On 22/11/09 (09:30 till 15:00) Stop and Go boards in place to carry out the permanent reinstatement. Daily activity between 08:00 and 15:00.
21 Nov 09 : Traffic is flowing well in the area.
Houndsditch / A1211 (Stepney)
At the junction of Houndsditch / A11 and St Botolph Street / A11
30 Jun 07 to 30 Jun 11
Northbound and southbound direction. The construction of a temporary link road between Houndsditch and Duke's Place to enable construction traffic from St Botolph demolition site to exit the City. The link road which would be in place for 3- 4yrs until the works at Heron Tower are completed.
Kennington Lane / A3204 (Stockwell)
At the junction of Kennington Park Road / A3
02 Nov 09 to 27 Nov 09
Westbound direction. Ongoing Victorian Water Main replacement programme, Thames Water require the right turn from Newington Butts into Kennington Lane to be closed to facilitate this phase of the works.
21 Nov 09 : Right turn from Newington Butts into Kennington Lane is closed. The bus lane and left turn from Kennington Park Road into Kennington Lane is also closed. Traffic is moving well in the area.
Kennington Road / A23 (Bermondsey)
At the junction of Lambeth Road / A3203
17 Nov 09 to 27 Nov 09
Southbound direction. Single alternate lane traffic controlled by four way temporary traffic signals to facilitate emergency water works.
21 Nov 09 : Temporary traffic signals with single alternate lane in place. Traffic is currently flowing well in the area.
Kingsland High Street / A10 (Stoke Newington)
At the junction of Gillett Street
17 Nov 09 to 23 Nov 09
Southbound direction. There will be a lane one closure for footway works.
Knightsbridge / A4 (Belgravia)
At the junction of Sloane Street / A3216
From 17 Nov 09
Westbound direction. Lane two restriction in place westbound at the junction of A4 Brompton Road and Knightsbridge.
21 Nov 09 : Lane restriction remains in place. Traffic is flowing well past the works.
Lewisham Road / A2211 (Greenwich)
At the junction of Blackheath Hill / A2
21 Nov 09 to 22 Nov 09
All directions. Various restrictions in place controlled by four-way temporary traffic signals to facilitate water works.
M25 (Brentwood)
On M25 between M25 J27/M11 J6 and M25 J28/A12(T)/A1023
26 Jul 09 to 01 Aug 10
Clockwise and Anti-clockwise direction. Major widening works. Speed restrictions and no hard shoulder in operation.
M25 Bell Common Tunnel (Epping)
At the junction of M25 J27/M11 J6 and M25 J26/A121
30 Jun 08 to 31 Mar 10
Eastbound and westbound direction. Bell Common Tunnel Refurbishment (situated to the West of M25 Jct 27) - Some overnight closures will be in place.
New Cross Road / A2 (New Cross)
At the junction of Casella Road
16 Nov 09 to 27 Nov 09
Eastbound direction. Bus lane restriction in place on approach to the junction with Casella Road.
New Cross Road / A2 (Peckham)
At the junction of Avonley Road
13 Nov 09 to 26 Nov 09
Northbound direction. Lane restrictions in place on New Cross Road just after Avonley Road junction.
New Kent Road / A201 (Bermondsey)
On New Kent Road / A201 between Elephant And Castle Roundabout / A3 and Bricklayers Arms Roundabout
10 Sep 09 to 30 Nov 09
Eastbound direction. Road reduced to 1 lane 24/7 for footway works.
Newham Way / A13 (Victoria Docks)
At the junction of Prince Regent Lane / A112
21 Nov 09 to 22 Nov 09
Eastbound and westbound direction. Slip road lane closures to facilitate road marking works.
Nine Elms Lane / A3205 (Clapham)
At the junction of Wandsworth Road / A3036
28 Sep 09 to 11 Dec 09
Northbound and southbound direction. TfL are carrying out works to reconstruct the pedestrian crossing. Lane restrictions and bus stop closures to facilitate the works.
Old Broad Street (City, North West)
On Old Broad Street between Threadneedle Street and Throgmorton Street
17 Nov 09 to 13 Dec 09
Northbound and southbound direction. Road is closed in both directions. Diversion route is via. Threadneedle Street, Bishopsgate and Wormwood Street.
Old Street / A5201 (Islington)
At the junction of Vince Street
21 Nov 09 to 22 Nov 09
Northbound and southbound direction. Lane one and two closure southbound and lane one closed northbound on Old Street. Vince Street will be completely closed. Daily activity between 08:00 and 14:00.
21 Nov 09 : Closures are now in place. Traffic is flowing well through the restrictions.
Piccadilly Circus (West End)
At the junction of Piccadilly Circus / A4 and Glasshouse Street and Piccadilly / A4
23 Oct 09 to 23 Aug 10
All directions These are long term works that will require various restrictions to facilitate a contra flow bus lane through the Circus.
21 Nov 09 : Between 16/11/09 and 22/11/09 there are restrictions in Regent Street in the northbound direction at the left turn from Piccadilly Circus. No visible restrictions are currently in place on Shaftesbury Avenue. Traffic flow is currently normal for the time of day.
Portman Street / A41 (Marylebone, West)
At the junction of Oxford Street / A40
21 Nov 09
Northbound direction. Carriageway patching works.
21 Nov 09 : There are no reports of traffic congestion at present. Traffic is currently flowing well in the area.
Richmond Circus (Richmond upon Thames)
At the junction of Twickenham Road / A316 and Kew Road / A307 and Lower Mortlake Road / A316
06 Jul 09 to 04 Dec 09
Various phases for works that will involve all approaches at some point. There are 7 phases for these long term works. Phase 2 starts 04/08/09 for 4 weeks. This involves a closure of Twickenham Road westbound overnight for duct installation. Phase 3 starts 12/09/2009 for 3 weeks this involves an overnight closures of Kew Road South bound for duct installation. Phase 4 starts 12/09/2009 for 2 weeks and involves off peak day works where Richmond Circus southbound to Kew Road will be restricted to two lanes. Lane 1 will be closed for works. Phase 5 starts 22/09/2009 for 1 week and involves the closure of Kew Road North nightly. Phase 6 starts 30/09/2009 for 2 weeks and involves lane 1 restriction on the northside of Richmond Circus. Phase 7 starts on 13/10/2009 for 1 week and involves restrictions on the North East corner of Richmond Circus.
Richmond Circus (Richmond upon Thames)
At the junction of Twickenham Road / A316 and Kew Road / A307 and Lower Mortlake Road / A316
From 03 Jul 09
East and westbound. National Grid Gas will be removing part of a traffic island on the eastbound carriageway during off peak working on Friday 3rd July. Saturday and Sunday works will have a westbound restriction of the near side lane from 1900.
Seven Sisters Road / A503 (Finsbury Park)
At the junction of Woodberry Grove
24 Aug 09 to 31 Mar 10
Westbound direction. Bus lane restriction to facilitate works.
Seven Sisters Road / A503 (Finsbury Park)
At the junction of Blackstock Road / A1201
From 19 Nov 09
Northbound and southbound direction. Lane restrictions are in place.
21 Nov 09 : The A503 is reduced to one lane in both directions at the junction of Blackstock Road. Traffic is currently light and flowing well through the restrictions at present.
St Georges Road / A302 (Bermondsey)
On St Georges Road / A302 between Geraldine Street and Princess Street
09 Nov 09 to 29 Nov 09
Eastbound and westbound direction. Various lane closures in place. Daily activity between 07:30 and 16:00.
St Giles Circus (Holborn)
At the junction of Oxford Street / A40 and Charing Cross Road / A40 and New Oxford Street / A40
05 Jan 09 to 05 Jan 16
Northbound direction. On the weekends of 21st - 22nd November as well as the 28th - 29th, from 0800 - 1800, temporary signals will be in place at the junction of Oxford Street and Charing Cross Road. These works are part of the ongoing Tottenham Court Road station upgrade works. Normal restrictions are as follows: Charing Cross Road will be reduced to two lanes northbound, Andrew Borde Street will be closed and there will be no access to Charing Cross Road from Sutton Row.
Strand / A4 (Holborn)
At the junction of Aldwych / A4
28 Oct 09 to 27 Nov 09
Westbound direction. Lane one closed approaching the junction for signalling works.
Strand / A4 (Holborn)
On Strand / A4 between Lancaster Place / A301 and Duncannon Street
11 Nov 09 to 11 Dec 09
Eastbound and westbound direction. There will be a lane 2 closure in both directions along the Strand to facilitate ongoing water works in the area.
Strand / A4 (Westminster)
On Strand / A4 between Aldwych / A4 and Trafalgar Square / A4
07 Oct 09 to 06 Dec 09
Eastbound and westbound direction. Lane restrictions in both directions to facilitate roadworks Expect delays in the area.
Streatham High Road / A23 (Streatham)
On Streatham High Road / A23 between Kempshott Road and Streatham Common South
From 26 Oct 09
Northbound and southbound direction. Victoria mains replacement works. Lane closures north then southbound in different phases.
Streatham High Road / A23 (Streatham)
At the junction of Kempshott Road
02 Nov 09 to 27 Nov 09
Northbound and southbound direction. Various lane restrictions in place at various location along Streatham High Road.
Surrey Quays Road (Rotherhithe)
On Surrey Quays Road
21 Nov 09 to 05 Feb 10
Northbound and southbound direction. LUL will be storing two containers on Canada Water Bus station, located on the outer perimeter of the LUL entrance for approximately 12 weeks. The containers will be surrounded with Herras fencing and contractors accessing the containers will only do so in engineering hours (0100-0500). There will be a short crane operation to install the containers however this will take place between 0200 and 0400 on the 21st November, short holds may occur for the Route 188 serving Surrey Quays Road at this time.
21 Nov 09 : At present there are no reports of traffic congestion.
The Parkway / A312 (Maidenhead)
On The Parkway / A312 between Hayes Road and M4
16 Nov 09 to 22 Nov 09
Northbound and southbound direction. Various lane closures will be in place to facilitate works. Daily activity between 09:30 and 16:00.
Thurloe Place / A4 (Chelsea)
At the junction of Brompton Road / A308
From 20 Apr 09
Westbound Lane restrictions in place on Exhibition Road between Cromwell Road and Thurloe Place.
Thurloe Place / A4 (Chelsea)
At the junction of Brompton Road / A4
21 Nov 09
East and westbound. Lane restrictions to facilitate works.
21 Nov 09 : Lane restrictions are currently in place. Traffic is flowing well on approach.
Tooley Street / A200 (Bermondsey)
On Tooley Street / A200 between Bermondsey Street / A2205 and Tower Bridge Road / A100
01 Sep 09 to 27 Nov 09
Northbound direction. Thames Water (Victoria Mains Replacement) works on Tooley Street between Battle Bridge Lane and Potters Fields. The westbound contraflow bus lane is closed with bus services on diversion.
Trafalgar Square (Holborn)
At the junction of Pall Mall East / A4 and Spring Gardens and Cockspur Street / A4
20 Nov 09 to 24 Nov 09
Eastbound direction. National Grid will be reducing the carriageway to 1 lane eastbound on both Cockspur Street and Pall Mall East entering Trafalgar Square for gas works.
21 Nov 09 : Lane one is closed on Trafalgar Square westside. Expect delays on approach.
Twickenham Rugby Stadium (Whitton)
At the junction of Rugby Road and Whitton Road / B361
21 Nov 09
All directions Rugby Union - England v New Zealand, kick off at 14:30hrs
Upper Clapton Road / A107 (Clapton)
On Upper Clapton Road / A107 between Gunton Road and Cleveleys Road
18 Nov 09 to 03 Dec 09
Northbound direction. Lane 1 bus lane will be closed at the location to facilitate BT works Daily activity between 09:00 and 17:00.
21 Nov 09 : Traffic is moving well in the area.
Upper Richmond Road / A205 (Putney)
On Upper Richmond Road / A205 between West Hill / A3 and Putney Hill / A219
07 Oct 09 to 11 Dec 09
Westbound direction. Southern Gas Networks have planned gas main replacement works between Putney High Street and East Putney Station. To facilitate these works Upper Richmond Road is closed westbound between Keswick Road and Putney High Street. Eastbound traffic on Upper Richmond Road is unaffected. Access will be maintained westbound on Upper Richmond Road up to Keswick road for local traffic. Westbound A205 Traffic will be diverted via West Hill, Tibbet's Corner, Tibbet's Ride and Putney Hill. Upper Richmond Road will have local access to Keswick Road.
21 Nov 09 : Westbound Upper Richmond Road remains closed. Drivers are advised to seek alternative routes.
Upper Richmond Road West / A205 (Mortlake)
On Upper Richmond Road West / A205 between Palewell Park and Penrhyn Crescent
From 11 Sep 09
Eastbound and westbound direction. Lane one restriction east and westbound to facilitate water works.
21 Nov 09 : Sheen Lane is closed southbound from Upper Richmond Road West. Expect some delays, particularly during peak travel times.
Upper Thames Street / A3211 (City, South West)
At the junction of Kennett Wharf Lane
16 Nov 09 to 29 Nov 09
Westbound direction. Lane one restricted westbound on Upper Thames Street junction with Kennett Wharf Lane to demolish and rebuild a chamber.
21 Nov 09 : Lane one (out of two) is closed. Traffic is flowing well through the restrictions at present.
Vernon Place / A40 (Bloomsbury)
On Vernon Place / A40 between Bloomsbury Way / A40 and Southampton Row / A4200
From 24 Aug 09
Eastbound direction. Offside lane restrictions in place for streetworks.
21 Nov 09 : Vernon Place has the bus lane closed and there is an offside eastbound lane restriction on Bloomsbury Way. Expect delays in the area at peak times.
Victoria
VICTORIA
From 08 Sep 09
All approaches Victoria Station Upgrade Works - Extensive ongoing works in the area with traffic restrictions at various times on Wilton Road, Bressenden Place, Victoria Street and Vauxhall Bridge Road.
21 Nov 09 : Lane restrictions remain in place as follows: Bressenden Place has lane restrictions in place. Vauxhall Bridge Road has an two of fours lanes closed between Victoria Street and Neathouse Place. Expect delays during peak periods.
Victoria Street / A302 (Westminster)
At the junction of Bressenden Place / A202
20 Nov 09 to 22 Nov 09
Westbound direction. minor works will be taking place in the offside carriageway of Westbound Victoria Street by the junction of Bressenden Place. Daily activity between 19:00 and 09:00.
21 Nov 09 : No restrictions in place.
Wandsworth Road / A3036 (Lambeth (South))
On Wandsworth Road / A3036 between Nine Elms Lane / A3205 and Bridgefoot / A202
21 Nov 09 to 22 Nov 09
Northbound direction (one-way street). Three lanes (out of five) closed to dismantle a tower crane at St. George's Wharf.
21 Nov 09 : At present there are no reports of traffic congestion.
Western Avenue / A40 (Ruislip)
On Western Avenue / A40 between Church Road / A312 and West End Road / A4180
21 Nov 09
Westbound Accident on the A40 between Target Roundabout and Polish War memorial
21 Nov 09 : The A40 has reopened westbound - Traffic flows have returned to normal
Westminster Area
WESTMINSTER
21 Nov 09
All directions Procession route: Whitehall Place, Whitehall, St. Martins Place, Charing Cross Road, Tottenham Court Road, Euston Road, Gower Street, Gower Place, Endsleigh Gardens, Endsleigh Street, Tavistock Square, Tavistock Place, Cartwright Gardens, Mabledon Place and Bidborough Street. The march will be facilitated with traffic holds by Police.
Westway / A40 (Regent's Park)
On Westway / A40 between Old Oak Common Lane and Edgware Road / A5
From 08 Aug 09
Eastbound and westbound direction. The closures will be implemented every Sunday off peak between 02:00 and 10:00. These works will be implemented using the cyclic maintenance closures with traffic diversions via Old Oak Common, Holland Park Roundabout and Sussex Gardens and therefore the entire elevated section will be closed one approach at a time. Please note at no time will both the eastbound and westbound carriageway be closed at the same time unless in an emergency.
21 Nov 09 : Works take place on sundays between the hours of 0200 and 1000 hours.
Transport for London


