Hammersmith & City line
Completion date: 2016
Transforming the Hammersmith & City line
The Circle and Hammersmith & City lines include the oldest section of the Tube - from Paddington to Farringdon - and are often crowded and congested. Our upgrade of these lines includes introducing a fleet of longer, more spacious, air-conditioned trains.
From 2011 we will be introducing 53 new seven-car trains which will feature:
- Air conditioning
- Walk-through carriages
- Wheelchair areas
- Wider doors and walkways
- Easier access between train and platform
- Better audio and visual information systems
- CCTV
- An energy-efficient braking system
Both lines currently operate six-car trains, which have a 17 per cent lower capacity than seven-car trains.
By 2013 all the new trains will be in use on these lines.
Once the new enhanced signalling system is introduced by 2016, capacity on each will have increased by 65 per cent.
Get a sneak preview of our new trains for the Metropolitan, Circle, Hammersmith & City and District lines, coming your way from 2010 onwards
Transport for London
