Go to: Main Content Go to: Navigation

Transport for London

Londoners to face fewer delays at traffic signals

01 July 2010

- Almost six per cent reduction in traffic delays for drivers without holding up pedestrians - Drivers now spend less time at red lights following more than 1,000 traffic signal reviews in 2009/10

We've now identified 145 sites where we think the signals may no longer be doing a useful job

Kulveer Ranger, the Mayor's Transport Advisor

- 145 traffic signal sites across London considered for removal to help smooth traffic flow

Drivers are spending less time sitting at traffic lights, after Transport for London (TfL) reviewed the timings of more than 1,000 sets of lights in the Capital last year.

As part of the Mayor's pledge to smooth traffic flow, TfL reviewed timings at 1,003 signals last year to ensure they were operating as efficiently as possible.

Changes made to the signals as a result of the reviews have delivered a six per cent reduction in unnecessary delays at traffic signals, without negatively impacting on pedestrians.

TfL will review timings of a further 1,000 traffic signals this year and for the next four years to ensure that the Capital's signals are operating in the best possible way for both drivers and pedestrians.  

Smooth traffic flow

TfL has also identified 145 sites where traffic signals could be causing unnecessary delays. 

They will be holding discussions with local boroughs and stakeholders about whether these traffic signals could be removed or replaced with alternative measures, to further smooth traffic flow in the Capital.

Kulveer Ranger, the Mayor's Transport Advisor, said: 'There are few things more annoying than sitting at a traffic light on red for no apparent reason and we've now identified 145 sites where we think the signals may no longer be doing a useful job.

'By getting rid of them, we hope we can smooth traffic flow across London and deliver real improvements for all road users.'

Key commitments

Garrett Emmerson, Chief Operating Officer for London Streets, TfL, said: 'Re-timing traffic signals to get London moving is one of the Mayor and TfL's key commitments.

'I am delighted that we have been able to significantly cut down on delays at traffic signals, without impacting negatively on pedestrians.'


Notes to editors:

Number of occasions when queued traffic will have cleared through the first green phase (2009/10):

   Before %  After % Change %
 Overall  71.70  77.60  5.90
 AM period  53.56  61.62  8.06
 Off-peak  66.88  75.40  8.52
 PM peak  51.10  59.64  8.54
 Late evening  85.75  90.78  5.03
 Weekend period  69.45  74.86  5.41
 Overnight

 97.60

 98.28  0.68

 

 Number of occasions when pedestrians waiting to cross the road, easily clear the kerb during the first green man/blackout period (2009/10):

   Before %  After % Change %
 Overall 94.30 94.60 0.30
 AM period 91.64 92.30 0.66
 Off-peak 92.63 93.15 0.51
 PM peak 90.19 90.59 0.40
 Late evening 98.10 97.94 0.16
 Weekend period 92.37 93.18 0.81
 Overnight 99.62 99.63 0.02

 

Journey Planner

Journey details
Date and time of travel
at :

Public transport options

I prefer...

I use these modes...
Cycling & Walking options
I want to...
minutes

minutes

You are here:
CorporateMediaNews CentreRelease archiveJuly 2010

Elsewhere on tfl.gov.uk